Part X: Shingled Roof on Stained House
As you can see from the pictures below, exterior has been stained, the shingles have been put on the roof, and some of the interior infrastructure work has been done. Photos below were taken on 12/22/06.
Insulation and duct work:
Interior view of (part of) master bedroom. The interior is yet to be stained.
Hope you're excited to see all the progress. The whole house should be finished in about a month (or two).
Main entrance (the front door is on order):
Insulation and duct work:
Interior view of (part of) master bedroom. The interior is yet to be stained.
Hope you're excited to see all the progress. The whole house should be finished in about a month (or two).