Part XII: Doors, Cabinets, and Other Woodwork
Another major accomplishment this week is log railing for the steps & loft of the second floor.
Here are some of the doors. This is the picture of the second floor. The doors are for the two bedrooms (side-by-side) and a closet. The small stained rectangle on the right door represents stain color that will soon be used on all interior doors and trim.
Couldn't resist showing you a picture of the local winter-wonderland. The photo below was taken on 2/3/07, but the snowy landscape hasnt't changed much.
With hope (and some work), the whole project will be done in a month. There is still quite a bit of interior work to be done including flooring, plumbing (no toilets at the moment), more staining, and finishing of the kitchen and bathrooms. We are looking forward to moving here in the spring.