Part XIII: Home Stretch
The photos below were taken on March 24, 2007. As you can see, lighting fixtures were put in, along with the floors and other finishing touches. The house is on track to be finished by March 30, 2007. The 'major to dos' include portions of interior staining and fireplace:
Note the flexible track lighting installed by the master of the house:
Dining Area (Chandelier will be lowered):
A coat of stain has been put on the railing:
Fireplace is still in-progress (awaiting masonry work):
Master bedroom light fixture:
A peek at the Master Bathroom (yes, it's whirlpool):
Note the flexible track lighting installed by the master of the house:
Dining Area (Chandelier will be lowered):
A coat of stain has been put on the railing:
Fireplace is still in-progress (awaiting masonry work):
Master bedroom light fixture:
A peek at the Master Bathroom (yes, it's whirlpool):